MSc Dissertations
Home > Publications > Dissertations
Planning, Optimization and Efficiency Improvement of Telecommunications Solar Plants
2023
Maama Ronny Seeiso
Economic Comparison of Solar-PV and Diesel-operated Pumping Systems for Irrigation Applications in Lesotho
2023
Mafa Tukula
Design and economic analysis of a Solar Thermal Pre-cooling System for Agro-Produce Cold Chain in Lesotho
2023
Mpho Lucas Yengane
The gender perspective of socioeconomic determinants of household cooking energy consumption in Lesotho
2023
Palesa Nkaile
Analysis of the categories of the sustainability dimensions to achieve sustainable mini-grids
2023
Tanki Alfred Maema
GIS-Based Electrification Planning for Lesotho using OnSSET/GEP
2023
Tšepo Letebele
Design and analysis for a feasibility study of a floating solar PV power system for Metolong Dam
2022
Rorisang Christopher Moqulo
An optimization approach for the economic dispatch incorporating renewable energy resources into the LEC power sources portfolio
2022
Thato Nchakha Rateele
Rehabilitation of Katse Dam Mini- Hydropower Plant
The Katse Dam Mini-Hydropower station was designed to generate and supply electricity to auxiliary systems without connecting to the grid. This would increase the dam power supply and reliability thereby reducing the electricity bill incurred on the Lesotho Highland Water Project (LHWP) for operations. However, to date, the Mini-Hydropower station is not fullyoperational. In this study, the decommissioned Katse Dam Mini-Hydropower plant’s rehabilitation is evaluated. Three significant activities characterized this rehabilitation process. The upgrading of electro-mechanical equipment or damaged parts, using condition assessment filters. Uprating is explored by flow duration plots for the possibility of increasing plant capacity. Lastly, the capacity dispatch (Integration) is studied intensively with computer software package (DigSilent Power Factory), for grid integration alternatives. In general, electrical equipment is the plant's most vulnerable to fatigue. Mechanical equipment is moderately damaged, with governor and guide bearing systems standing out. Assessment of the potential of the plant’s capacity increase revealed that the reservoircompensation flow regime resulted in minimum design values of head and discharge being fulfilled 96% of the time. The Katse Dam load capacity is met 90% of the time, while the maximum single machine power is exceeded 84% of the time. The Mini-Hydropower stable response to dam load growth and decline without a grid was shown in the grid integration option. However, there was a substantial deviation to a sudden loss of grid without load shedding, and the local bus voltage dropped below 6% tolerance. The findings of this investigation demonstrated the need for this plant to be rehabilitated. All the necessary tests on relevant components point to the goals of the plant and the necessity for restoration. According to the economic study, implementing this project will result in a 9-year return on investment and a 2.02 MWh annual energy guarantee, which is 54% of the yearly energy consumption of the auxiliary systems.
2022
Ntoampe W. Thamae
Feasibility study of micro-hydropower resources at three selected mini-grids sites for potential integration of micro-hydro with solar mini-grids.
2022
Mamokhomo Mateboho Sekaleli
Estimating hydropower generation potential of the Metolong dam.
2022
Mokhothu Emmanuel Moerane
Determining Cost Effective Integrated Renewable Energy Resource Plan for Lesotho (2022-2040)
2022
Tsoarelo Nelson Nzemene
Modelling and optimization of micro grids for rural areas in Lesotho (component sizes for technical and economic feasibility)
2021
Thabo Samuel Fonya
Tracking SDG7 progress for Lesotho using energy indicators for sustainable development
2021
Mamontsi Kolobe
Investigating viability of using solar thermal energy for optimizing the gas yields for biogas in Lesotho
2021
Tabempe Edgar Lesenyeho
Analysis of the viability of using solar thermal energy for Maluti Mountain Brewery
2021
'Malillane Lillane
Development of time-of-use tariffs
2021
Lebohang Mohasoa
Techno-economic analysis and policy design for PV electricity net-metering systems in Lesotho
2021
Lebohang Albert Moleko
ACE One cook stove: Determination of optimal feedstock and performance of integrated home charging system
2021
Thato Qoola
Optimized network planning of electrification projects in remote areas of Lesotho
2021
Thuso Stephen Motiki
Development of solar radiation database and its integration into solar process applications in Lesotho
2020
Lebohang Bulane
Construction of a long-term hourly electricity demand curve and peak load using MAED-EL for Lesotho
2020
Leana Kente
Formulating Short-Term Electricity Demand Forecasting For Lesotho
2020
Lereko Lefela
Optimization of Mantsonyane and Semonkong mini hydro power stations by hybridization
2020
Bahlakoana David Lepheana
The Impact of Intermittent Renewable Energy Generators on Lesotho National Electricity Grid
2020
Sebota Mokeke
Development of charcoal briquettes using Sehalahala (Seriphium plumosum and Felicia filifolia)
2020
Kanono Thabane
Energy Supply Management System for Lesotho: User Interactive System
2020
Tsepo Phineas Mololo
Analysis of Quthing River and Letseng-la-Letsie for Hydropower Potential
2020
Liteboho Lekhanya
Determination of Cost-Reflective Feed-in Tariff for Grid Connected Solar PV Systems in Lesotho
2020
Limpho Kokome
Optimization of the Choice of Solar Minigrid Architecture and Management in Lesotho
2020
Moruti Clement Kao
Energy Audit and Management Opportunities for a Diamond Mine: A case for Lets’eng Diamond Mine
2020
Masiane Ntelekoa
Optimal sizing, performance prediction and economic appraisal of off-Grid Solar PV hybrid power systems in Lesotho: A reliability–cost approach
2020
Selone Augustinus Lepolesa
Evaluation and optimisation of solar water pumping systems for Lesotho
2020
Itumeleng Moses Moholo
Determinants of choice of household energy fuel in Lesotho